PHS Home
PHS Home
 

Completed DEP Stormwater Sites

1. 8th & Norris
The end result at 8th and Norris; trees and shrubs help absorb rainwater into the ground.

2. 8th & Berks
Construction begins on the 8th and Berks location; hydro-seeding is used to restore the grass.

3. 1900 North 3rd
The completed site before and after rainfall.

4. 9th & Norris
Landscaping at the 9th and Norris site; the berm allows rainwater to gradually seep through the ground.

5. 2300 North 3rd
The 2300 block of 3rd Street during construction; the finished product.

 